Ultra-light Equipment allowing the complete Maintenance Works in Tunnel, on all the width, and with a total Safety.
This Movable Scaffolding Bridge runs simultaneously on the two Tracks, and the side of the Platforms.
It is completely adjustable in height as the layout of the Station,. Its components in aluminium-tubes are very light, and easy to assembly by 4 Workers in 20-25 minutes.
It is equipped with brakes on Tracks, and on Platforms.
The PER-1 Scaffolding-Bridge is approved by “APAVE” Office.
TECHNICAL CHARACTERISTICS
1/ ON THE TRACKS
2/ ON THE PLATFORMS
DIMENSIONS :
Width : 2.60 m.
Length : 9.90 m
Height : adjustable in function of the layout of Tunnels.